Customer Service Rate Card
Date 10.02.2016 HO/Price Circular/001/016/Rev 03 Customer
WAC / SAC Job Type Job Description Charges
WAC upto 2 Ton Installation Existing wood frame -Exact opening 350
Existing Wooden Frame - Adjustment in Opening 500
Supply and fixing of wood frame 750
Grill cutting , supply & fixing of wooden frame 2,000
Wall Opening , supply & fixing of wooden frame 2,250
Breakdown Inspection charge 300
Breakdown call only Adjustment 400
Part replacement only Labour 500
Gas Charging (R410 Rs. 250/- additional) 2,250
Service Dry service 350
Wet service 500
Dismantling Labour Charges 350
SAC upto 2.5 Ton Installation Installation standard 1,500
Installation with ODU Mounting bracket 2,250
Breakdown Inspection charge 350
Breakdown call only Adjustment 450
Part replacement only Labour 500
Gas Charging R22 2,750
Gas charging R410 & R32 3,000
Service Dry service 500
Wet service -without Dismantling IDU & ODU 1,000
Wet service -Dismantling IDU & ODU - R410 Only 2,500
Dismantling Labour charges 750
Accessories Copper pipe with Insulation per meter for R22 700
Copper pipe with Insulation per meter for R410 & R32 750
4 core Electrical cable per meter 70
PVC Drain Pipe per meter 60
ODU Mounting Stand -Supply & Fixing 700
CASSETTE
1.5TR/2.0TR/
2.5TR/3.0TR/
3.5TR/4TR
Installation Standard Installation upto 2.5Tr - Labour Charges 2,500
Standard Installation upto 3.0Tr/3.5TR/4.0TR - Labourr Charges 3,500
Copper Piping with Insulation- R22 gas-per meter 700
4 Core cable -1.5 to 2.5 Sqmm - rate per meter 70
Standard Wall Bracket (ODU)with rubber pad UPTO 1.5tr 700
Fabricated Wall Bracket (ODU)with rubber pad 2.0tr / 2.5tr 2,500
Service Inspection charges* 500
Dry Service 500
Wet Service without dismantling 1,500
Wet Service – Dismantling IDU/ODU 3,000
Parts Replacement - Labour charges 500
Dismantling upto 2.0 Tr- Labour charges 750
Dismantling above 2.0 Tr- Labour charges 750
Gas Charging** 1.5TR/2TR 3,500
Gas Charging** 2.5TR/3.0TR/3.5TR/4.0TR 4,500
Controller PCB Repair charges 1,250
Display PCB Repair charges 500
Remote handset repairs 600
DUCTABLE
1.5TR/2.0TR/
2.5TR/3.0TR
3.5TR/4.0TR/
5.0TR
Installation Will be given by the Project team based on site condition
Service Inspection charges* 500
Dry Service 450
Wet Service 1,000
Wet Service – Dismantling IDU/ODU 3,000
Parts Replacement - Labour charges 500
Gas Charging**1.5TR/2.0TR 3,500
Gas Charging** 2.5TR/3.0TR 5,000
Gas Charging** 3.5TR/4.0TR/5.0TR 6,000
Controller PCB Repair charges 1,000
Remote handset repairs 600
Terms and Conditions
Inspection Charges will be collected from the customer at the time of inspection.The same will be adjusted in the Labour charges,
if the customer approves the estimate with in 15 days of inspection. (CR date)
In case of WAC installation - Wall breakage charges will be extra.
In case of SAC installation - opening for piping in Concrete will be charged extra.

Transportation charges are additional as per distance (Maximum limit of Rs. 750/-)
3 months Warranty to be given by SFs for all Gas charging for any leaks in the same spot.
All the above prices are exclusive of Taxes. Service Tax to be charged extra (as applicable).
Above rates does not includes the cost of spare parts. Spare parts cost will be charged extra as per the price list.
No Inspection / Labour Charges will be applicable for Dry / Wet Service (PMS) calls
Customer scope of work: Electrical work relating to incoming power supply, industrial plug and socket, Earthing.